Modebest logo
24 years

Projects

 
Harbour Central, London Docklands
Galliard Homes

The development consists of six blocks comprising a 41 storey tower, a 35 storey tower, a 27 storey tower, a 24 storey tower and 2 low rise blocks over a large single storey basement. The development will accommodate 901 number residential units. Read more...

 
Telegraph Works, Greenwich
Weston Homes

This is a current ongoing project that entails the construction of 16 number townhouses and 4 number RC blocks. Block A comprises the 16 number townhouses. Blocks B, C & D are eight storey low rise RC blocks and Block E is an eighteen storey high rise RC block. Read more...

 
Lewisham Gateway, Phase 1B
John Sisk & Son Ltd

This is a current ongoing project that entails the construction of the Groundworks and Reinforced Concrete high rise frames to two residential blocks. Block B1 is a 15 storey RC Frame and Block B2 is a 22 storey RC Frame. Read more...

 
Colindale Phase 4 – Former British Newspaper Library
Fairview New Homes

Construction of RC Groundworks and RC Frames to Blocks A, B, C/E, D and F. Under-slab and site-wide drainage and services, road construction and hard landscaping works. Read more...

 
Lyon Square, Harrow
Redrow Homes

The project entailed the construction of a residential/commercial mixed use scheme comprising Groundworks, RC Basement & Substructures and RC Frames to Blocks 1-8, a large shared RC podium transfer slab over the basement with eight RC Cores and Frames... Read more...

 
Forbury Place, Reading – Phases 1 & 2
Galliford Try Construction

The project entailed the construction of two new build office buildings situated centrally in Reading comprising an undercroft basement, podium slab and 8 storey buidings above. Read more...

 
Colindale, Phases 1, 2 & 3 - Former Colindale Hospital
Fairview New Homes

Construction of RC Groundworks and RC Frames to Blocks P, Q, N1 and N2. External Works and hard landscaping to the Link Roads for the National Blood Service offices, Montrose Square and Colindale Station concourse works. Read more...

 
Abbey Mills Shaft F Internal Structures
MVB (Morgan Sindall, Vinci & Bachy JV)

Abbey Mills Shaft F Internal Structures consisted of over 6600m3 of reinforced concrete. 3100m3 of that forming the main 1m thick spine walls. 70m in height from pit bottom. The RC H Shaped spine walls consisted of an 8m x 8m central core. Read more...

 
Egerton Crescent, London – Underpinning, Mini Piling and Top-down Basement Construction Works
ME Construction

Construction of a waterproof reinforced concrete double storey basement extension to an existing Grade II listed terraced town house in central London, including underpinning and the lowering of the existing... Read more...

 
Fulham High Street – Enabling & Archaeological Principle Contractor Works
Meyer Bergman (MB Fulham Limited)

Principle Contractor Project incorporating the construction of a single storey sheet piled basement, piled foundations to apartment blocks, foundations to terraced houses and associated archaeological, enabling and demolition works. Read more...

 
Grand Union Centre, Ladbroke Grove
John Sisk & Son Ltd

The project entailed the construction of a residential and commercial mixed used scheme comprising 133 number residential units, in 2 number six storey blocks of private flats and 2 number six storey blocks of shared ownership/rented, and I number commercial block. Read more...

 
Brook Avenue, Wembley
Mulalley

Remediation of the existing ground followed by the construction of 3 number 9 storey reinforced concrete frames and 1 number 6 storey reinforced concrete frame parallel to the London Underground railway tracks adjacent to Wembley Park Station. Read more...

 
Holland Park Avenue, Shepherds Bush Roundabout
Shepherd Construction On behalf of Redrow Homes

The project entailed the construction of a residential/commercial mixed use scheme comprising groundworks, a single storey reinforced concrete basement and a ten storey reinforced concrete frame. Read more...

 
White Water Centre, Lee Valley, London Olympics 2012
Morrison Construction / Galliford Try

A civil engineering project for the construction of a new White Water Centre on a brown field site in the Lee Valley, Broxbourne, Hertfordshire. The new White Water Rafting and Canoe Centre formed part of the London Olympics, 2012. Read more...

 
Golf Links Estate, Southall
Durkan Ltd

The project entailed the construction of 5 number blocks of terraced housing and 2 number blocks of 6 storey low rise reinforced concrete frames forming 36 number houses and 26 number flats. Read more...

 
Gayton Road, Harrow
Fairview New Homes Ltd

This is a current project that entails the construction of 5 reinforced concrete frames, 3 of which are constructed from a podium transfer slab, spanning a single storey basement car park. The development consists of 360 apartments, commercial space and associated amenities. The project runs from November 2016 to April 2018 and is valued at £15M. Read more...

 
Farmiloe Building, Clerkenwell London
Wates Construction Ltd

The historic Farmiloe Building in the heart of the City of London is being converted and extensively enlarged by this innovative project Read more...

orange stripes

0

Current Workforce

0

Projects Completed

0

Offices

Latest News

16th September 2018

Charity Bicycle Run from London to Brighton

Modebest team take part in demanding cycle run from Clapham Common to Brighton in aid of Centrepoint Read more...

5th September 2018

DIY SOS GRENFELL

Modebest Builders are proud to be supporting the BBC DIY SOS programme as they build a brand-new home for the Dale Youth Boxing Club. Read more...

14th May 2018

Modebest has Moved to Brand New Premises

Modebest is proud to announce that we have constructed bespoke brand-new premises which we have called ‘MOY HOUSE’. Read more...

27th April 2018

We Are Moving

Modebest is moving to brand new premises with effect from 14th MAY 2018 Read more...

“We retain all of our own modern reinforced concrete frame equipment and falsework systems, our own tower cranes, concrete pumps and tipper lorries which enable us to be self-sufficient on our projects”

  • Achilles
  • Lighthouse Charity
  • Women into Construction
  • SMAS
T: + 44 (0) 20 8900 1981  |  F: + 44 (0) 20 8903 5238  |  E: info@modebest.co.uk
Specialists in: Groundworks | RC Frames | Civil Engineering
Specialists through: Expertise | Innovation | Competence | Safety