Harbour Central, London Docklands
Galliard Homes

The development consists of six blocks comprising a 41 storey tower, a 35 storey tower, a 27 storey tower, a 24 storey tower and 2 low rise blocks over a large single storey basement. The development will accommodate 901 number residential units. Read more...

 
Telegraph Works, Greenwich
Weston Homes

This is a current ongoing project that entails the construction of 16 number townhouses and 4 number RC blocks. Block A comprises the 16 number townhouses. Blocks B, C & D are eight storey low rise RC blocks and Block E is an eighteen storey high rise RC block. Read more...

 
Lewisham Gateway, Phase 1B
John Sisk & Son Ltd

This is a current ongoing project that entails the construction of the Groundworks and Reinforced Concrete high rise frames to two residential blocks. Block B1 is a 15 storey RC Frame and Block B2 is a 22 storey RC Frame. Read more...

 
Colindale Phase 4 – Former British Newspaper Library
Fairview New Homes

Construction of RC Groundworks and RC Frames to Blocks A, B, C/E, D and F. Under-slab and site-wide drainage and services, road construction and hard landscaping works. Read more...

 
Lyon Square, Harrow
Redrow Homes

The project entailed the construction of a residential/commercial mixed use scheme comprising Groundworks, RC Basement & Substructures and RC Frames to Blocks 1-8, a large shared RC podium transfer slab over the basement with eight RC Cores and Frames... Read more...

 
Forbury Place, Reading – Phases 1 & 2
Galliford Try Construction

The project entailed the construction of two new build office buildings situated centrally in Reading comprising an undercroft basement, podium slab and 8 storey buidings above. Read more...

 
Colindale, Phases 1, 2 & 3 - Former Colindale Hospital
Fairview New Homes

Construction of RC Groundworks and RC Frames to Blocks P, Q, N1 and N2. External Works and hard landscaping to the Link Roads for the National Blood Service offices, Montrose Square and Colindale Station concourse works. Read more...

 
Abbey Mills Shaft F Internal Structures
MVB (Morgan Sindall, Vinci & Bachy JV)

Abbey Mills Shaft F Internal Structures consisted of over 6600m3 of reinforced concrete. 3100m3 of that forming the main 1m thick spine walls. 70m in height from pit bottom. The RC H Shaped spine walls consisted of an 8m x 8m central core. Read more...

 
Egerton Crescent, London – Underpinning, Mini Piling and Top-down Basement Construction Works
ME Construction

Construction of a waterproof reinforced concrete double storey basement extension to an existing Grade II listed terraced town house in central London, including underpinning and the lowering of the existing... Read more...

 
Fulham High Street – Enabling & Archaeological Principle Contractor Works
Meyer Bergman (MB Fulham Limited)

Principle Contractor Project incorporating the construction of a single storey sheet piled basement, piled foundations to apartment blocks, foundations to terraced houses and associated archaeological, enabling and demolition works. Read more...

 
Grand Union Centre, Ladbroke Grove
John Sisk & Son Ltd

The project entailed the construction of a residential and commercial mixed used scheme comprising 133 number residential units, in 2 number six storey blocks of private flats and 2 number six storey blocks of shared ownership/rented, and I number commercial block. Read more...

 
Brook Avenue, Wembley
Mulalley

Remediation of the existing ground followed by the construction of 3 number 9 storey reinforced concrete frames and 1 number 6 storey reinforced concrete frame parallel to the London Underground railway tracks adjacent to Wembley Park Station. Read more...

 
Holland Park Avenue, Shepherds Bush Roundabout
Shepherd Construction On behalf of Redrow Homes

The project entailed the construction of a residential/commercial mixed use scheme comprising groundworks, a single storey reinforced concrete basement and a ten storey reinforced concrete frame. Read more...

 
White Water Centre, Lee Valley, London Olympics 2012
Morrison Construction / Galliford Try

A civil engineering project for the construction of a new White Water Centre on a brown field site in the Lee Valley, Broxbourne, Hertfordshire. The new White Water Rafting and Canoe Centre formed part of the London Olympics, 2012. Read more...

 
Golf Links Estate, Southall
Durkan Ltd

The project entailed the construction of 5 number blocks of terraced housing and 2 number blocks of 6 storey low rise reinforced concrete frames forming 36 number houses and 26 number flats. Read more...

orange stripes

0

Current Workforce

0

Projects Completed

0

Offices

Latest News

1st December 2016

Modebest are awarded Thorn Turn site safety award, November 2016 from Morgan Sindall

Our operative, Ioan-Iulian Costan won the Thorn Turn, Highways Depot project Health and safety award for November 2016. Read more...

27th October 2016

Modebest win major CONSTRUCT Award

Modebest are proud to have won a CONSTRUCT Innovation Award at the annual awards during October 2016. Our project at Abbey Mills, Shaft F, for our client MVB Joint Venture, was the overall winner in the category of Projects over £2.50M that exemplify innovation and people talent in the concrete sector. Read more...

1st September 2016

Modebest has recently commenced work on a civil engineering project at Thorn Turn Waste Park & Highways Depot, Houghton Regis, Bedfordshire for Morgan Sindall

Modebest are delighted to have recently been awarded a civil engineering contract by our client Morgan Sindall for a project, Thorn Turn Waste Park & Highways Depot. Read more...

25th July 2016

Summary of Archaeological Finds on our Design & Build project at Fulham High Street

Modebest are engaged as a Principle Contractor for a Design & Build project at Fulham High Street. The project is for the Enabling and Archaeological works incorporating sheet piling to the basement, bored piling, basement excavation and reinforced concrete foundations. Read more...

“We are a ‘can-do’ company, who value long term relationships and repeat business. We are dependable and will deliver on our promises”

T: + 44 (0) 20 8900 1981  |  F: + 44 (0) 20 8903 5238  |  E: info@modebest.co.uk
Specialists in: Groundworks | RC Frames | Civil Engineering
Specialists through: Expertise | Innovation | Competence | Safety

Modebest Builders Ltd

Unit 2,
29 Fourth Way,
Wembley,
Middlesex,
HA9 0LH, UK