23 years

Gayton Road, Harrow

Client: Fairview New Homes Ltd
Value: £15M
Duration:November 2016 - April 2018
Project Type: Groundwork and RC Frames
Engineer: Mike Mannion

Project Description

This is a current project that entails the construction of 5 number RC frames, 3 of which are constructed from a podium transfer slab spanning a single storey basement car park. The development consists of 360 apartments, commercial space and associated amenities.

Scope of Works

We are engaged by Fairview New Homes as a domestic Sub-Contractor on a bespoke form of Sub-Contract with design responsibility for the sheet-piled wall. The scope of works comprises enabling works including site set up, piling mat installations, the construction of a sheet-piled wall along a live London Underground railway boundary. The permanent sewer connection was 11m deep, we used a 3m diameter caisson method of construction to form this. The groundworks involved circa 30,000m3 bulk excavation to facilitate a basement carpark construction. Installation of a Xylem Water Solutions pumping station with 33m3 emergency storage capacity and a 2.9m diameter, 680m3 Tubosider Helibore attenuation tank as part of the overall drainage design. The Basement and podium slab construction included a waterproof perimeter wall and 700mm thick RC transfer slab designed to carry Fire & Emergency rescue vehicles. There were 5 number RC frames ranging from 6-11 storeys. Within our package we supplied and managed 4 number tower cranes to facilitate the construction phase of the project. Works commenced on site in November 2016.




orange stripes


Current Workforce


Projects Completed



Latest News

1st December 2016

Modebest are awarded Thorn Turn site safety award, November 2016 from Morgan Sindall

Our operative, Ioan-Iulian Costan won the Thorn Turn, Highways Depot project Health and safety award for November 2016. Read more...

27th October 2016

Modebest win major CONSTRUCT Award

Modebest are proud to have won a CONSTRUCT Innovation Award at the annual awards during October 2016. Our project at Abbey Mills, Shaft F, for our client MVB Joint Venture, was the overall winner in the category of Projects over £2.50M that exemplify innovation and people talent in the concrete sector. Read more...

1st September 2016

Modebest has recently commenced work on a civil engineering project at Thorn Turn Waste Park & Highways Depot, Houghton Regis, Bedfordshire for Morgan Sindall

Modebest are delighted to have recently been awarded a civil engineering contract by our client Morgan Sindall for a project, Thorn Turn Waste Park & Highways Depot. Read more...

25th July 2016

Summary of Archaeological Finds on our Design & Build project at Fulham High Street

Modebest are engaged as a Principle Contractor for a Design & Build project at Fulham High Street. The project is for the Enabling and Archaeological works incorporating sheet piling to the basement, bored piling, basement excavation and reinforced concrete foundations. Read more...

“Our vision is to be a company that our clients will want to work with, rely on and that our personnel will be proud to work for. A company with an open mind ready to embrace new opportunities, innovative and driven to deliver a safer, low carbon and sustainable product”

T: + 44 (0) 20 8900 1981  |  F: + 44 (0) 20 8903 5238  |  E:
Specialists in: Groundworks | RC Frames | Civil Engineering
Specialists through: Expertise | Innovation | Competence | Safety

Modebest Builders Ltd

Unit 2,
29 Fourth Way,