Merrick Place
Due for completion in 2025 this project comprises of sheet piling, slipform to both towers, precast columns and insitu cores to remaining two blocks.
Due for completion in 2025 this project comprises of sheet piling, slipform to both towers, precast columns and insitu cores to remaining two blocks.
Completed in 2023 utilising slipform, precast columns, and Ascent safety screens to safeguard the public and the workers on this high-rise construction project.
Location Dunstable, Bedfordshire, LU5 Client Morgan Sindall Value £4m The project consists of large areas of concrete and tarmacadam paving together with reinforced concrete retaining walls and ramps, building foundations and both under-slab and site-wide drainage and services. There are over 14 kilometres of drains and services and in excess of 7,000m3 of concrete to be placed in a programme...
Location Wandsworth, London, SW18 Client Hollybrook Value £9m A mixture of Traditional Build, Slip Form Construction and Post-tensioning works, this was a project that required a detailed logistics plan from the outset. The works consisted of 3 blocks, ranging from 10 - 14 storeys high including a deep basement with an associated ramp and a large Podium...
Completed in 2023 utilising slipform, precast columns, and Ascent safety screens to safeguard the public and the workers on this high-rise construction project.
Bedford Passage is a new mixed-use development consisting of commercial, healthcare and residential space located between existing buildings including a listed workhouse building. The eight-storey building will house 34 residential units in the heart of Fitzrovia, approximately 70 per cent of which will be affordable for social rent and for...
This Project consisted of 4 Blocks linked by a large podium slab ranging from 5 floors to 7 floors in height. The cores were formed using traditional Peri Trio formwork and the columns formed in Pre-cast.
The Tottenham Court Road Oversite Development (OSD) comprised of two new-build residential blocks, Block C (7 floors) and D (6 floors), situated above the western entrance to the Tottenham Court Road Crossrail Station. At ground level, there is provision for retail units, plant room, operational station accommodation and entrances to...
The works on this prominent development consisted of 2 No Towers constructed off and existing podium slab utilising Slipform Construction.
Abbey Mills Shaft F is part of the Thames Tideway Tunnel, a 25km combined sewer that runs under River Thames is designed to capture, store & convey all raw sewage that previously overflowed into the estuary.