Isle of Dogs,
London E14
Client
Galliard
Homes
Value
£44m

A prestigious development for one of our valued clients, Galliard Homes, this project was for the construction of 6 blocks, the tallest being 42 storeys including a deep single-storey basement in Canary Wharf.
Accommodating 901 residential units the development also included leisure and commercial units, MBL constructed the groundworks, RC Frame and External Works on this high-end-use residential development.
The basement required the installation of flying shores, spanning some 66m and the erection of 5 No. Tower Cranes. Four of the blocks were constructed utilising slip-form construction with over 17,000m3 of excavation, 9,500 tonnes of reinforcement and 52,000 m3 of concrete in this project as a whole. Post Tensioning construction was detailed for the upper floors providing both programme and cost benefits.
To complete the project, the External Works were carried out with high-quality paving and street furniture for this Public Realm area to complement this exclusive development.