Herne Hill,
London, SE24
Client
Durkans
Value
£8m
This project consisted of 3 Blocks linked by a large podium slab on a tight site bordered on 3 sides by Network Rail train lines.
The job involved the construction of a 16 Storey Tower formed using Twin wall panels for the Cores complete with Pre-cast stairs and landings. The columns were also Pre-cast, and this allowed for a quick turn around on floor cycles as well as achieving an exposed concrete finish to the internal walls of the Staircase. The site itself was logistically challenging and required precise planning and just in time deliveries. The use of Pre-cast reduced the number of deliveries required significantly.
Completed in 2023 using predominately Pre-cast vertical elements to reduce the volume of deliveries to this very logistically challenging site.