Vauxhall,
London, SE11
Client
Galliford
Try
Value
£3m
This 10 storey building in the heart of Vauxhall was constructed on 100% of the site footprint using predominately Pre-cast construction in very close proximity of 2 neighbouring party walls.
The decision to use Pre-cast was mainly down to the logistical challenges of building on 100% of the site footprint and not having any laydown area. The Pre-cast elements also provided an excellent finish to the exposed concrete which was the specified finish by the client.
Completed in 2022 using predominately Pre-cast vertical elements to reduce the volume of deliveries to this very logistically challenging site.